AQMD logo graphic South Coast Air Quality Management District



BOARD MEETING DATE: September 21, 2001 AGENDA NO. 7




PROPOSAL:

Execute Additional Contracts to Generate Emissions Credits Under the State Emissions Mitigation Program

SYNOPSIS:

At its July 20, 2001 meeting, the Board established the State Emissions Mitigation Fund to recognize up to $30,000,000 in State funds from the CARB, and approved the first round of emission reduction projects amounting up to $12,447,439. This action was in response to the Governor’s statewide program to mitigate excess emissions from peaker power generation units. Funds transferred from the CARB are for implementation of local projects within the South Coast Air Basin. Staff recommends the expenditure of an additional $6,372,471 from this fund on the second round of emission reduction projects.

COMMITTEE:

None

RECOMMENDED ACTION:

Authorize the Executive Officer to execute contracts to fund projects listed in Attachment A, selected pursuant to the CARB’s requirements within the South Coast Air Basin, in an amount not exceeding $6,372,471 from the State Emissions Mitigation Fund.

Barry R. Wallerstein, D.Env.
Executive Officer


Background

The Governor has recently created a statewide program to mitigate excess emissions from peaker power generation units that are needed to alleviate the power crisis in California. The CARB has solicited project proposals in this regard, and has requested that the AQMD administer these emission reduction projects qualified under the CARB guidelines that will be conducted in the South Coast Air Basin. In response to this request, the Board at its July 20, 2001 meeting, approved the establishment of the State Emissions Mitigation Fund, and approved the first round of emission reduction projects amounting up to $12,447,439 in pass through funds.

Proposal

New project proposals have been evaluated for the second round of funding according to the CARB selection procedure. The newly qualified projects under the CARB guidelines are listed in Attachment A. The list shows the cost and the expected NOx and particulate matter emissions reductions for each project. Once realized, these projects will offset emission increases from peaker power generation units that must operate to supply peak power loads. Total cost of the additional projects is $6,372,471. Due to the urgent need to offset emission increases from these peaker power units, AQMD staff proposes that the Board authorize the Executive Officer to execute contracts for the projects listed in Attachment A. Contracts will be executed for each selected project expeditiously so that the emission reductions can occur as soon as possible.

As additional phases of CARB project awards are announced, the AQMD staff will report back to the Board, and will seek the Board’s approval to award contracts in the same fashion as this Board action.

Benefits to AQMD

The successful implementation of this program will result in mitigation of excess NOx and particulate matter emissions produced by peaking power plants, which must operate to accommodate peak electrical loads. Some of these projects will also produce concurrent toxic compounds emissions reductions (e.g. lowered diesel exhaust particulate), which is an additional benefit. Finally, administration of this program at the local level will provide greater certainty and confidence for achieving the emission reductions since the AQMD has acquired experience and expertise in identifying emission sources and available control or prevention technologies.

Resource Impacts

Total cost of the proposed projects listed in Attachment A, shall not exceed $6,372,471. Sufficient funds are available from the State Emissions Mitigation Fund.

Attachment:

List of State Emission Mitigation Projects
 

Attachment A: List of State Emission Mitigation Projects
 

Applicant

Bid
Amount

Project Summary

Technology

Proposed Pollutant
(tons)

PM

NOx

C.W. Poss

$159,200

Repower a dual engine scraper, and a construction and mine truck

Diesel repower

0.427

4.53

C.W. Poss

$29,639

Repower a wheel tractor dozer

Diesel repower

0.055

0.69

Don McCoy Corp.

$260,475

Repower 5 heavy-duty diesel construction engines

Diesel repower

0.80

8.19

Howard Contracting, Inc.

$67,005

Repower a scraper and a grader

Diesel repower

0.093

2.66

Sukut Construction, Inc.

$903,200

Repower 18 heavy-duty diesel engines on 10 vehicles

Diesel repower

4.14

58.1

Sukut Construction, Inc.

$479,021

Repower 10 heavy-duty diesel engines on 6 vehicles

Diesel repower

1.6

8.28

Chandler Palos Verdes Sand & Gravel

$6,447

Replace 1 heavy-duty diesel construction engine

Diesel  replacement

0.002

0.43

Jaguar

$496,850

Repower 12 heavy-duty diesel construction engines

Diesel repower

2.27

31.2

Nelson & Belding

$265,350

Repower 6 heavy-duty diesel construction engines

Diesel repower

7.54

0.72

Crane Rental Services, Inc.

$76,104

Repower 3 heavy-duty diesel trucks

Diesel repower

0.19

1.48

Crane Rental Services, Inc.

$35,084

Repower 2 heavy-duty diesel trucks

Diesel repower

0.09

0.61

Cattrac

$554,460

Repower 9 scrapers

Diesel repower

2.0

24.7

Griffin Dewatering

$54,600

Repower 8 diesel water pumps

Diesel repower

0.07

1.70

Vulcan

$169,209

Repower 7 engines

Diesel repower

1.29

14.53

Vulcan

$54,333

Repower 4 engines

Diesel repower

0.24

1.25

Tudor

$372,660

Repower 8 diesel scrapers

Diesel repower

1.55

19.84

Connolly Pacific

$99,022

Repower 9 heavy-duty diesel construction equipment

Diesel repower

0.24

3.95

Dennis McCoy

$114,800

Repower 2 diesel dozers

Diesel repower

1.11

7.9

E.L. Yeager

$1,320,190

Repower 29 diesel construction engines

Diesel repower

6.06

71.02

E.L. Yeager

$185,244

Repower 5 diesel construction engines on four vehicles

Diesel repower

0.77

4.28

Cattrac Construction

$122,625

Repower 3 wheel scrapers

Diesel repower

0.36

3.87

C.W. Poss

$354,480

Repower 9 heavy-duty construction engines

Diesel repower

0.99

11.3

C.W. Poss

$51,521

Repower a wheel loader

Diesel repower

0.11

1.19

Sysco Food Services of LA

$140,952

New dual fuel heavy-duty trucks

Dual fuel

0

1.83

GRAND TOTAL

$6,372,471

   

32.0

284.2

/ / /