BOARD MEETING DATE: October 7, 2005
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PROPOSAL:
SYNOPSIS:
COMMITTEE:
RECOMMENDED ACTION:
Barry R. Wallerstein, D.Env. Background Continued expansion of the natural gas fueling infrastructure needs to occur in order to support increased public and private fleet alternative fueling needs and support future incentive program awards such as the Low Emissions School Bus Replacement Program and the Carl Moyer Program. On June 3, 2005, the Board awarded funding for the two proposals and approved the re-release of an RFP to solicit proposals for natural gas refueling station infrastructure projects in the amount of $1,020,567. This funding is designed to offset capital investment costs, resulting in conveniently located, publicly-accessible fueling stations. For this RFP, funding was only provided for natural gas fueling stations. Applications were accepted from either public agencies or private entities (i.e. state and local governments, automobile manufacturers, alternative fuel suppliers, manufacturers of natural gas related equipment, and end users of natural gas motor fuel). Proposal to Fund June 2005 Solicitation Eight proposals were received by July 8, 2005 (the closing date of the solicitation) totaling over $1.4 million in requested funding. Staff performed a review of each proposal and determined that that six of the eight new proposals met the minimum technical qualifications for funding. Two proposals were for existing station upgrades and did not identify new or additional fueling throughput and were deemed unresponsive to the solicitation. Staff recommends funding all six technically qualified new proposals in the amount of $1,054,137. The level of required cost share is based upon the amount of grant funds requested (see Table 1 below) and the cost share is based upon cash expenditures, (i.e. land/lease, equipment, engineering, permits, installation, etc.). In-kind services are limited to 10 percent of the total proposed cost of the project. Table 1. Cost-share request limitations
The general requirements of the RFP are identified below:
As fully developed codes and standards for hydrogen fueling stations do not currently exist, the RFP did not require components to be currently hydrogen compatible; however, it provided for additional points to applicants committing to station designs and space consideration that could incorporate hydrogen compatible equipment for future transportation applications. Equipment modifications and retrofitting with hydrogen compatible plumbing, tubing, dispensers and compressors qualified for these additional points. Of the eight proposals received, seven made specific commitments for making the fueling infrastructure project hydrogen compatible in the future, including:
In an effort to streamline the proposal selection process and accelerate the timeliness for stations to be constructed and commence fueling operations, all eight proposals were evaluated by staff and those projects that were responsive to the solicitation and met the minimum technical standards were deemed qualified. As mentioned above, eight proposals were received by the RFP deadline of July 8, 2005. In addition to the existing infrastructure network, most of these new projects are strategically located to help establish an infrastructure "backbone" that will allow for fueling of all types of natural gas vehicles throughout the region. Two of the proposals received are not recommended for funding as they were deemed un-responsive with respect to identifying additional fueling throughput for the upgraded stations. Table 2. Projects proposed to be funded from June 2005 solicitation
Proposal to Fund January 2005 Solicitation On January 7, 2005, the Board approved the release of an RFP to solicit proposals for natural gas refueling station infrastructure projects in the amount of $245,428. Seven proposals were received by the closing date. All seven proposals received were judged to be technically qualified; however there were only enough funds to fully fund two of the seven highest scoring proposals in the amount of $224,861. Staff also recommends that four proposals held over from the previous solicitation of January 7, 2005 be funded in the amount of $530,000 as the four were technically qualified but were not funded due to a shortfall at the time. Table 3. Projects proposed to be funded from January 2005 solicitation
In summary, staff is requesting the Boards approval to fund the ten proposals listed in Tables 2 and 3 above at a cost not to exceed $1,584,137. Benefits to AQMD The 2003 AQMP relies on the expedited implementation of advanced technologies and clean-burning fuels in Southern California to achieve air quality standards. By constructing more natural gas fueling facilities, benefits from this project will accrue to all cities and area residents. Such new construction will provide a coordinated effort, plan for growth of the overall infrastructure and enable the transition to future hydrogen refueling infrastructure. There are economies of scale from the extensive infrastructure being planned and installed, possibly reducing the cost and making alternative refueling stations more affordable. While having no direct impact on air emission reductions, new CNG and LCNG stations will help facilitate the introduction of low-emission, natural gas-fueled vehicles (NGVs) initially in private and public fleets in the area. Such increased penetration of NGVs will provide direct emissions reductions of NOx, VOC, CO, PM, and air toxic compounds throughout the Basin. Outreach In accordance with AQMDs Procurement Policy and Procedure, a public notice advertising the RFP/RFQ and inviting bids was published in the following publications:
Additionally, potential bidders may have been notified utilizing the Los Angeles County MTA Directory of Certified Firms, the Inland Area Opportunity Pages Ethnic/Women Business & Professional Directory; and AQMDs own electronic listing of certified minority vendors. Notice of the RFP/RFQ was mailed to the Black and Latino Legislative Caucuses and various minority chambers of commerce and business associations, and placed on the Internet at AQMDs Web site (http://www.aqmd.gov). Information was also available on AQMDs bidders 24-hour telephone message line (909) 396-2724. In addition to publication in the above-cited publications, over 100 individual RFP notices were mailed to interested businesses and individuals. Bid Evaluation Proposals received were evaluated by a technically qualified panel in accordance with criteria contained in the attached RFP. The evaluation panel consisted of an AQMD Fleet Rules Implementation Manager and a Program Supervisor; one Caucasian and one Asian/Pacific Islander; two male. Attachment B provides a summary of the proposals received ranked by the scores received from the evaluation panel. In an effort to streamline the proposal selection process and accelerate the timeliness for stations to be constructed and commence fueling operations, all eight proposals were evaluated by staff and those projects that were responsive to the solicitation and met the minimum technical standards are being recommended for funding. Eight proposals were received with a requested funding totaling $1,424,719. Of the eight proposals received, six were scored with a technical value above 56 points (the minimum score needed for further consideration). The remaining two proposals did not specify any new or additional fueling throughput and were not considered for funding. LNG Refueling Infrastructure Recently, there have been several disruptions in the production of LNG that have created security and supply concerns. Staff believes it prudent to analyze the sources of LNG supply relative to short- and long-term refueling demands and requests that the Board set aside $500,000 from the Clean Fuels Fund to facilitate the development and expansion of the LNG refueling infrastructure. A list of potential projects to address this matter is presented in Attachment A. Staff will develop an RFP to solicit projects to increase local capacity of LNG for transportation vehicles operating in the South Coast Air Basin. Staff will provide the RFP for the Boards consideration at its November meeting. Resource Impacts
Attachment (EXE 60kb) A - LNG Refueling Infrastructure Development and Expansion / / / |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||